Welcome to CSEE ! 13-15 September, 2024 Wenzhou, China 中文(简体)

Home / Press & Links /

What's New

Big News, DONGFANG Electric won a big order!

In order to solidly promote the study and implementation of Xi Jinping's new era of socialist thought with Chinese characteristics theme of education in a deep and practical way, the results of the theme of education into a concrete effect, recently, Dongfang Electric Wind Power Co., Ltd. won the bidding for the 400 megawatts of Coal Mubi Forty Wells wind power project.

The project is the first cooperation between Dongfang Electric and China Coal Group in the field of new energy, and is a strong support for the joint implementation of the "double carbon" strategy. The project is located in Mubi Kazakh Autonomous County, Changji Hui Autonomous Prefecture, Xinjiang Uygur Autonomous Region, and is scheduled to be installed with 80 sets of Dongfang Wind Power's independently-developed 5 MW-grade doubly-fed wind turbines.

Dongfang Electric's 5 MW grade doubly-fed wind turbine adopts a platformized and modularized design, applying the company's mature control strategy, electrical system, yaw system, tower, frame and other structures and technologies, and can be configured with 183m, 195m and other specifications of wind turbine diameters in accordance with the actual conditions of the wind farm. The wind turbine also meets the demand for onshore single blade lifting, which can save 20%-40% of the lifting area and significantly reduce the cost of land acquisition and leveling. Breaking the complex terrain restrictions, can be in the dense trees, mountains and other obstacles can not be ground assembly of wind turbines in the area to complete the lifting operation.

In recent years, Dongfang Wind Power deeply implement the Group's leading strategy, bold innovation, in the application of new materials, localization substitution, intelligent load shedding technology, tower lightweight design, intelligent operation and maintenance has made greater breakthroughs, 5 MW grade doubly-fed wind turbine research and development, the application of a number of innovative technologies, the overall technology of the unit to reach the industry's leading level.

  7.14 2.jpg

  

Based on good power generation performance, high economy and other advantages, Dongfang Electric 5 MW grade doubly-fed wind turbines have been favored by users since they were put into the market last year. Up to now, more than 4,000 megawatts of orders have been obtained in Shandong, Sichuan, Inner Mongolia, Hunan, Xinjiang, Liaoning, Chongqing and other provinces and cities.


China Coal Mubi Forty Jingzi 400 MW wind power project is one of the Xinjiang Autonomous Region coal power flexibility transformation project, Oriental Wind Power marketing team according to the site wind resources for many times to optimize the program, and ultimately to the project power generation, the economy of the optimal customized level of integrated program, to win the user's recognition.


China Coal Mubi forty wells 400 MW wind power project won the bid to further expand the company's "circle of friends". 2022, Dongfang Wind Power in Xinjiang to "the year of signing, the year of construction, the year of completion, the year of effect" of the "new speed of the East", "the new speed of the East". "Oriental new speed", built an annual output of 2 million kilowatts of wind power host and blade manufacturing base, a powerful boost to Xinjiang to speed up the establishment of a modern industrial system to support high-quality development. The winning of the project is of great significance for the company to continue to consolidate and expand the market in Xinjiang region and promote the healthy development of the industry.